KidKraft Cedar Summit Canyon Ridge Installation And Operating Instructions Manual page 62

Table of Contents

Advertisement

Step 21: Crowsnest Assembly
Part 5
F: Attach (202) Crowsnest Front flush to the top of each (190) Crowsnest Gusset and each (191) Crowsnest
Joist with 8 (S4) #8 x 3" Wood Screws. (fig. 21.8)
G: Place 1 (212) Crowsnest Side flush to the top and front of (200) Crowsnest Top make sure each board is level
then attach with 2 (S3) #8 x 2-1/2" Wood Screws per board. (fig. 21.8)
Flush and
level
S3
202
Wood Parts
2 x
Crowsnest Side 3/4 x 3-1/4 x 14-3/4"
212
212
200
190
191
S4
Flush
x 8
Hardware
8 x
#8 x 3" Wood Screw
S4
4 x
#8 x 2-1/2" Wood Screw
S3
62
Fig. 21.8
Flush and
level
190
212
S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents