GE LOGIQ 200 Quality Assurance Manual page 95

Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 0
4–3
SMPS ADJUSTMENTS
This section provides SMPS adjustment procedures for the LOGIQ α200. Adjustments should be only made
when necessary. SMPS adjustments should be made in accordance with the schedule for periodic maintenance
in Chapter 7 of this manual.
Before beginning the SMPS adjustments procedure, make sure the power outlet conforms to the proper power
line standards. Refer to Chapter 2, Installation.
If the adjustment pot is turned to far clockwise, the SMPS output shuts down to protect the circuits
against the over–voltage. In that case, power the LOGIQ α200 OFF and turn the pot
counterclockwise all the way. Then power it ON and try to adjust the SMPS again.
The SMPS Assy is in the bottom of the LOGIQ α200 as shown in ILLUSTRATION 4–6.
4–3–1
SMPS Assy Access
1.
Remove the four screw caps and unscrew the screws to remove the Left Cover as shown in the
ILLUSTRATION 4–3.
Left Cover
Note
LEFT COVER REMOVAL
ILLUSTRATION 4–3
4–7
LOGIQ α200 SERVICE MANUAL
2138853
FUNCTIONAL CHECKS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq 200 pro

Table of Contents