Physical Inspection/Cleaning (cont'd)
8. Re-seat PC Boards in Card Rack: Apply Power to the system and verify operation of all internal fans.
9. Reconnect Probes to System.
10. Note any performance or service related issues on the QA Testing Procedure in the comments
section.
Note any customer comments regarding performance issues in the comments section so that they may
be addressed.
Any SAFETY related concerns demand immediate attention prior to beginning the PM.
Check YES or NO to the group of eight questions. These DIRECTLY affect the ACR accreditation
application.
Check either CHANGE or NO CHANGE to indicate the overall electrical safety and cleanliness of the site
since the last inspection.
2-9
Power Supply Readings
Complete the Power Supply Checklist and verify they are within OEM specification.
Refer to the Service Manual or applicable service documentation for supply specifications and
tolerances.
Observe applicable safety precautions when checking high current and transmit supplies.
If the supplies listed in the checklist are not ALL present, strike through or record N/A for any listed supply
not found.
Observe data precautions when replacing NVRAM Batteries. If in question, BACK IT UP.
2-10
Re-Assembly and Final Checks
1. Reinstall all side covers and panels.
2. Reconnect any peripherals and interconnections removed.
3. Assure covers and side panels are aligned and secure.
4. If possible, return the system to its original location, if it was moved.
ULTRASOUND QUALITY ASSURANCE REFERENCE MANUAL
2-3
2262684-100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq 200 pro

Table of Contents