Preparation For Use - Tektronix 2212 User Manual

Digital storage & analog oscilloscope
Hide thumbs Also See for 2212:
Table of Contents

Advertisement

Preparation for Use
Before you use the 2212 Oscilloscope, refer to the Safety part of
this chapter for power source, grounding, and other safety con-
siderations pertaining to the use of the instrument.
Installation
Step
1:
Check that you have the proper electrical connec-
tions. The 2212 oscilloscope operates from a nominal
ac-power line between 95 V and 128 V rms or 190V to 250
V rms, depending on the power range setting inside the
instrument, as ordered with the 2212, with any frequency
from 48 Hz to 440 Hz.
Step
2:
Connect the proper power cord from the rear-panel
power connector to the power system.
Step 3: Check the fuse (located on the rear panel), to be
sure it is of the proper type and rating.
Use the following procedure to check that the proper fuse is
installed or to install a replacement fuse.
Step
1.
Unplug the power cord from the power-input
source
Step 2. Press in the fuse-holder cap and release it with a
slight counterclockwise rotation.
Step 3. Pull the cap (with the attached fuse inside) out of
the fuse holder.
Step 4. Verify that the installed fuse is the same type and
rating as that listed on the back of the instrument.
Step 5. Put the fuse (or replacement fuse) back in the fuse
holder cap.
Step 6. Reinstall the fuse and cap in the fuse holder by
pressing in and giving a slight clockwise rotation
of the cap.
~
This instrument can be damaged if the wrong line fuse
is installed.
2212 User Manual
1-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents