Figure 24: Remove Din Rail Mounting Bracket; Figure 25: Install Wall Mount Brackets On The Back Of The Switch - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

IS Series Industrial Ethernet Layer 2 Switch Installation Guide
AT-IS230-10GP
AT-IS130-6GP
Figure 24. Remove Din Rail Mounting Bracket
3. On the AT-IS130-6GP top and bottom panel and the AT-IS230-10GP
back panel, align and install the two wall mounting brackets (provided)
with the bracket mounting screws (provided). Refer to Figure 25.
AT-IS230-10GP
AT-IS130-6GP
Figure 25. Install Wall Mount Brackets on the Back of the Switch
67

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents