Advertisement

Chapter 3: Install the Switch
68
4. Hold the switch on the concrete or masonry wall or industrial panel at
the selected location for the device while you use a pencil or pen to
mark the locations of the four screw holes in the two wall brackets.
Refer to Figure 26.
Please follow these guidelines as you position the switch on the wall or
industrial panel:
The switch must be oriented as shown in Figure 26. You may not
install the switch horizontally or upside-down.
Be sure to leave sufficient space from other devices or walls to
allow for adequate air circulation around and through the cooling
fins. Refer to "Review Site Requirements" on page 56 for further
information.
Figure 26. Mark Wall Bracket Hole Locations