Hardware Components; Figure 1: At-Is230-10Gp Switch Front Panel; Figure 2: At-Is130-6Gp Switch Front Panel - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

Chapter 1: Overview

Hardware Components

18
The front panel of the AT-IS230-10GP switch is shown in Figure 1.
Fiber
1000Base-T
twisted-pair
ports
Fiber
1000Base-T
twisted-pair
ports
Figure 1. AT-IS230-10GP Switch Front Panel
The front panel of the AT-IS130-6GP switch is shown in Figure 2.
PoE Status
LEDs
Fiber Port
Figure 2. AT-IS130-6GP Switch Front Panel
System Status
LEDs
Reset Button
Console Management
Port
PoE Status LEDs
System Status
LEDs
1000Base-T
Twisted-Pair Ports

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents