Figure 16: Pre-Installed Components On The At-Is130-6Gp Front Panel - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

Figure 16 identifies the pre-installed components on the front panel of the
switch.
1
2
1
2
Figure 16. Pre-installed Components on the AT-IS130-6GP Front Panel
IS Series Industrial Ethernet Layer 2 Switch Installation Guide
One dust covers on the SFP slots
Five dust covers on the twisted-pair
ports and Console port
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents