Figure 29: Install Sfp Transceiver; Figure 30: Remove Dust Cover From Sfp Transceiver - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

Chapter 4: Install Twisted-Pair Ports Cables
74
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with its handle on the right and slide it into the
slot until it clicks into place. Refer to Figure 29.
Figure 29. Install SFP Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise for the AT-IS230-10GP
switch, repeat steps 1 to 3 to install the other transceiver in the
switch.
4. Remove the dust cover from the transceiver. Refer to Figure 30.
Figure 30. Remove Dust Cover from SFP Transceiver
SFP handle

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents