Power/Alarm Connector Cables; Power/Alarm Connector Wiring; Figure 36: Strip Power Or Alarm Wire - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

Power/Alarm Connector Cables

Power/Alarm
Connector
Wiring
The materials and tools needed to install the DC power and alarm cables
are provided by the user and are as follows:
12-18 AWG stranded wires.
6-wire connector for the power and alarm cables connections.
#1 flat-head screwdriver
Wire insulation stripper
Take into consideration the following guidelines before wiring the device:
The AT-IS230-10GP switch support dual +24-48VDC power
inputs.
The AT-IS130-6GP switch support dual +48-54VDC power inputs.
Tighten wire-clamps to a torque value 7 lb-in. to prevent the DC
wires from loosening.
The terminal block is suitable for 12-18 AWG (3.31 - 0.205 mm
P-Fail contacts are provided for switching a closed loop device,
such as alarm system, for transmit signals only and do not provide
power.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
To make the two pairs of DC power cables and one pair of wires for the P-
Fail alarm relay contacts, perform the following procedure:
1. Strip 6.5mm (0.25 in.) of insulation from the ends of each of power and
the alarm wires with a wire insulator stripper. Refer to Figure 36.
Figure 36. Strip Power or Alarm Wire
IS Series Industrial Ethernet Layer 2 Switch Installation Guide
6.5mm
(0.25 in.)
2
).
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents