Chapter 5: Power On Switch

Apply Power To Switch

Verify Switch
Operations
86
This section contains the procedure for powering on the switch.
To power on the chassis, perform the following procedure:
1. Apply power to the DC power supplies.
Note
The AT-IS230-10GP switch and AT-IS130-6GP switch do not have
an On/Off switch. To turn the unit OFF, you must turn OFF the
power supplies.
2. Wait a minimum of one minute for the switch to initialize its operating
system.
Here are items to check to verify that the switch is operating normally. If
there is a problem, refer to Chapter 6, "Troubleshooting" on page 91 for
suggestions on how to resolve it.
The Fault LED should be off.
One or both PWR 1 and PWR 2 LEDs should be solid green,
depending on the number of DC power supplies connected to the
unit.
The LEDs on SFP slots with transceivers connected to active
network devices should be solid or flashing green.
The Link LEDs on twisted-pair ports connected to active network
devices should be solid or flashing green or amber. The Link LEDs
are identified in Figure 9 on page 41 and Figure 11 on page 42.
The PoE LEDs should be solid green on ports that are connected
to PoE or PoE+ devices. The PoE LEDs are identified in Figure 13
on page 43.
If you have a AT-IS230-10GP switch, go to "Start Management Session"
on page 87.