Tools And Material - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

Tools and
The following tools and material are required for installing the switch on
a wall.
Material
Included with switch:
Not included with switch:
Two or four wall/equipment rack brackets for the
AT-x530-28GTXm or AT-x530-28GPXm respectively
Eight or sixteen screws for attaching the wall/equipment rack
brackets to the AT-x530-28GTXm or AT-x530-28GPXm
respectively: Length: 6.0mm (0.2 in.) Diameter: 4.0mm (0.2 in.)
Two or four anchors for concrete walls for the AT-x530-28GTXm or
AT-x530-28GPXm respectively: Length: 29.6mm (1.2 in.)
Diameter: 6.0mm (0.2 in.).
Two or four screws for wood or concrete walls for the
AT-x530-28GTXm or AT-x530-28GPXm respectively: Length:
32mm (1.3 in.) Diameter: 4mm (0.2 in.)
Two power cord retaining clips
Four rubber bumper feet
Cross-head screwdriver.
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring.
Drill and 1/4-inch carbide drill bit (for a concrete wall).
Refer to "Installing the Switch on a Concrete Wall" on page 87.
Plywood base (if you are installing the switch on a wall with
wooden studs). Refer to "Plywood Base for a Wall with Wooden
Studs" on page 78 for illustrations.
Four screws for attaching the plywood base to the wall.
Caution
The supplied screws and anchors might not be appropriate for all
walls. A qualified building contractor can determine the hardware
requirements for your wall prior to installing the switch.  E88
x530 Series Installation Guide for Virtual Chassis Stacking
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents