Allied Telesis x530 Series Installation Manual page 104

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

Chapter 7: Powering On the Stack
Table 9. Adding Ports 25 and 26 to the Stack Trunk (Continued)
Step
Enter the WRITE command to save your change. If this is the first management
8
session, the switch adds the configuration file DEFAULT.CFG to flash memory, for
storing your configuration changes. If you do not save your changes, they will be
discarded and you will have to reenter them when you reboot the switch in the next
step.
awplus# write
Building configuration ...
[OK]
9
Power off the switches of the stack.
10
Cable ports 25 and 26.
11
Power on the switches.
12
Wait three minutes for the switches to initialize their management software and form
the stack.
13
Repeat "Verifying the Stack" on page 102.
104
Description and Command

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents