Figure 42: Switch Initialization Messages (Continued) - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

x530 Series Installation Guide for Virtual Chassis Stacking
Initializing HA processes:
atmf_agentd, execd, exfx, hostd, atmfd, auth, epsr
hsl, imi, imiproxyd, lldpd, loopprot, mstp, nsm
pim6d, ripngd, rmon, sflowd, vrrpd, bgpd, irdpd
lacp, ospf6d, ospfd, pdmd, pimd, ripd, udldd
Received event network.initialized
Assigning Active Workload to HA processes:
hsl, irdpd, lacpd, loopprotd, mstpd, nsm, ospfd
ripd, rmond, sflowd, vrrpd, authd, epsrd, imi
imiproxyd, lldpd
Received event network.activated
Loading default configuration
..
done!
Received event network.configured
Figure 42. Switch Initialization Messages (Continued)
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents