Installing The Switch; Figure 23: Switch Orientations In An Equipment Rack - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

You can use the different sets of holes on the switch to install the switch in
the equipment rack in a variety of orientations. You can install it with the
front panel flush with, extending in front of, or recessed behind the front of
the equipment rack. The illustrations in Figure 23 show the switch
orientation with the front panel even with the front of the equipment rack.
Installing the
If you have not chosen an orientation for the switch in the equipment rack,
review "Switch Orientations in the Equipment Rack" on page 68.
Switch
Please review the installation guidelines in "Choosing a Site for the Switch"
on page 60 before installing the switch in an equipment rack.
Figure 23. Switch Orientations in an Equipment Rack
Caution
The chassis can be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E28
x530 Series Installation Guide for Virtual Chassis Stacking
1
3
5
7
9
PO RT
S 1-2
1G
0
LIN
K
2
11
AC T
10 0
LIN
4
K
13
AC T
6
15
PO RT
S 21
5G /2.
-24
5G /1G
8
17
LIN
K
AC T
10
19
10 0
LIN
K
12
21
AC T
14
23
PD
16
ON
25
PD
ER R
SF P+
18
27 /S
MA
X CU
1
RR EN
20
T
22
5G /2
.5G
/1 G/
10 0
24
26
10
G/
1G
28 /S
2
4572
CO NS
OL E
LA SE
CL AS
R PR
S 1
OD
UC
T
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents