Chapter 7
Powering On the Stack
This chapter contains the following procedures:
"Introduction" on page 92
"Installing the Power Cord Retaining Clips" on page 93
"Powering On the Switches Individually" on page 94
"Powering On the Switches Simultaneously" on page 98
"Starting a Local Management Session" on page 100
"Verifying the Stack" on page 102
"Adding Ports 25 and 26 to the Stack Trunk" on page 103
"Monitoring the Initialization Processes" on page 105
91