Figure 25: Installing The Switch In An Equipment Rack - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

3. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 25.
Figure 25. Installing the Switch in an Equipment Rack
4. Go to Chapter 7, "Powering On the Stack" on page 91.
x530 Series Installation Guide for Virtual Chassis Stacking
1
3
5
7
9
PO RT
S 1-2
1G
0
LIN
K
2
11
AC T
10 0
4
LIN
K
13
AC T
6
15
PO RT
S 21
5G /2.
-24
5G /1G
8
17
LIN
K
10
AC T
19
10 0
LIN
K
12
AC T
21
14
23
16
PD
ON
25
PD
ER R
SF P+
18
27 /S
MA
X CU
1
RR EN
20
T
22
5G /2
.5G
/1 G/
10 0
24
26
10
G/
1G
28 /S
2
4572
CO NS
OL E
LA SE
CL AS
R PR
S 1
OD
UC
T
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents