Figure 44: Installing An Sfp Transceiver; Figure 45: Removing The Dust Cover From An Sfp Or Sfp+ Transceiver - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.4.8-2
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

4. If you are installing the transceiver in a top slot, position the transceiver
with the Allied Telesis label facing up. If you are installing the
transceiver in a bottom slot, position the transceiver with the label
facing down. Refer to Figure 44.
Figure 44. Installing an SFP Transceiver
5. Slide the transceiver into the slot until it clicks into place.
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 through 5 to
install the remaining transceivers in the switch.
6. Remove the dust cover from the transceiver, as shown in Figure 45.
Figure 45. Removing the Dust Cover from an SFP or SFP+ Transceiver
x530 Series Installation Guide for Virtual Chassis Stacking
2 5
2
5 G /
2 . 5 G
/ 1 G
/ 1 0 0
2 6
2 5
2
5 G /
2 . 5 G
/ 1 G
/ 1 0 0
2 6
S F P
+
2 7 /
S 1
1 0 G
/
1 G
S F P
+
2 7 /
S 1
1 0 G
/
1 G
113

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x530-28gpxmAt-x530-28gtxm

Table of Contents