Heat Up - ABB i-bus KNX FCA/S 1.1M Product Manual

Fan coil actuator
Table of Contents

Advertisement

ABB i-bus KNX
4.6
Fast heat up/cool down
4.6.1

Heat up

© 2010 ABB STOTZ-KONTAKT GmbH
Planning and application
If the new valve position is greater than the current position during heat up,
the contact will close immediately.
The closing time is calculated from:
T
=
Valve adjustment duration from 0 to 100%
up
V
=
Current valve position [0...255]
cur
V
=
New valve position [0...255]
new
T
=
Switch on time of the PWM at the new valve position
new
T
=
PWM cycle time
cyc
T
=
Is added on the way to V
+1
passed through
Calculation of the closing time
T
cyc
T
new
255
*
V
new
T
V
up
act
T
*
1
255
255
Calculation of the closing time at switchover
T
T
T
atV
new
1
act
This means:
For a movement from 0...99 % the contact remains closed
for about T
+ T
.
up
cyc
For a change in the lower % range it results in significantly
shorter closing times than for changes in the upper % range.
Thereafter the contact is opened in accordance with the new PWM cycle
and the PWM cycle is started.
at every position
new
T
atV
1
T
1
act
...
atV
1
new
154

Advertisement

Table of Contents
loading

Table of Contents