ABB i-bus KNX
© 2010 ABB STOTZ-KONTAKT GmbH
Commissioning
Note
Purging can also be triggered via the bus with the
communication object Trigger valve purge.
After bus voltage recovery and download the purge cycle
continues, the bus failure time – the time for which the bus
actually failed – is not considered.
The purging cycle will restart if Purge cycle in weeks [1...12]
is changed after the download.
Reset purge cycle
from control value in % [1...99]
Options:
Hereby, the purge cycle from the set control value is reset.
1...99
75