Allen-Bradley LOGIX 5000 Reference Manual page 145

Controllers advanced process control and drives and equipment phase and sequence instructions
Hide thumbs Also See for LOGIX 5000:
Table of Contents

Advertisement

Process Control Instructions
All operator request inputs are cleared to false at the end of each scan. If
ProgValueReset is true, all program request inputs are cleared to false at the end of
each scan.
Resetting the TOT Instruction
When ProgResetReq transitions to true while ProgOper is true, the following
happens:
OldTotal = Total
Total = ResetValue
ProgResetDone is set to true
If ProgResetReq is false and ProgResetDone is true then ProgResetDone is cleared
to false
When OperResetReq transitions to true while ProgOper is false, the following
happens:
OldTotal = Total
Total = ResetValue
Calculating the Totalization
When RunStop is true and LowInCutoffFlag is false, the following equation
performs the totalization calculation.
where TimeBase is:
Value
Condition
1
TimeBase = 0 (seconds)
60
TimeBase = 1 (minutes)
3600
TimeBase = 2 (hours)
86400
TimeBase = 3 (days)
Rockwell Automation Publication 1756-RM006K-EN-P - November 2018
Chapter 1
145

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents