Installation Procedures For Converting Existing Systems To A High Availability Configuration; Connecting The Partner Node To The Primary Storage Shelf - VERITAS NetBackup 5330 Installation Manual

Appliance hardware
Table of Contents

Advertisement

Installation procedures for converting existing systems to a high
availability configuration
Connecting the partner node to the Primary
Storage Shelf
Hardware installation procedures for a NetBackup 5330 high availability configuration
See
"Verifying the hardware installation of a high availability configuration"
on page 91.
7.
Connect the power cords to the hardware.
See
"Connecting the power cords to the hardware"
8.
Turn on the power to each component in the same order as the installation.
See
"Turning on the hardware and verifying operation"
The installation procedures for converting existing systems to a NetBackup 5330
high availability (HA) configuration are as follows:
1.
Install the new NetBackup 5330 node (the partner node) in the rack with the
existing NetBackup 5330 appliance.
See
"Determining rack locations "
See
"Installing the compute node"
2.
Connect the new node to the Primary Storage Shelf.
See

"Connecting the partner node to the Primary Storage Shelf"

3.
Connect the new node to the existing node for HA communication.
See
"Connecting two nodes for HA communication"
4.
Verify the hardware installation of an HA configuration.
See
"Verifying the hardware installation of a high availability configuration"
on page 91.
5.
Connect the power cords to the hardware.
See
"Connecting the power cords to the hardware"
6.
Turn on the power to the new node.
See
"Turning on the hardware and verifying operation"
The following figure shows the locations of the FC ports in the partner node.
Connecting the partner node to the Primary Storage Shelf
on page 30.
on page 47.
on page 71.
on page 72.
on page 88.
on page 90.
on page 71.
on page 72.
88

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents