VERITAS NetBackup 5330 Installation Manual page 80

Appliance hardware
Table of Contents

Advertisement

11
On the front right panel of the compute node, press the power button to turn
on the compute node.
12
After a few minutes, verify that the compute node has fully initialized as follows:
On the right front panel of the compute node, locate the triangular Status
LED near the top of the LED panel. The LED should be green during normal
operations.
Verify that the disk drive LEDs have initialized properly as follows:
The Status LED (1) should not be lit. The following indications are also
possible:
A solid, amber, LED indicates a disk fault.
Hardware installation procedures
Turning on the hardware and verifying operation
80

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents