Hardware installation
procedures
This chapter includes the following topics:
■
■
■
■
■
■
■
■
■
■
■
■
■
Installing a Primary Shelf or an Expansion Shelf
Installing disk drives into a Primary Shelf or an Expansion Shelf
Installing the NetBackup 5330 compute node
Installing the SFPs into the Fibre Channel (FC) ports
Removing SFP end caps
Connecting a NetBackup 5330 compute node to a Primary Shelf
Connecting one Expansion Shelf to a Primary Shelf
Performing a soft shutdown before adding a new Expansion Shelf
Connecting a second Expansion Shelf to an existing 3TB Expansion Shelf and
a 3TB Primary Shelf
Connecting the power cords to the hardware
Turning on the hardware and verifying operation
Configuring the IPMI from the NetBackup Appliance Shell Menu
Accessing and using the Remote Management interface
Chapter
3