VERITAS NetBackup 5330 Installation Manual page 78

Appliance hardware
Table of Contents

Advertisement

8
Verify that the Power LED on the front, left, of the shelf is green.
9
After approximately 5 minutes to 10 minutes, verify that the shelf has fully
initialized as follows:
The 12 disk LEDs on the front of each drawer are green.
The blue Service Action Allowed LED is not lit.
Turning on the hardware and verifying operation
Power
Standby power
Locate
Temperature
Service action
required
Hardware installation procedures
78

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents