Turning on the hardware and verifying operation

4
On the compute node, connect a power cord to each power supply socket.
Connect the other end of each cord to a different PDU.
5
On the primary shelf, connect a power cord to each power supply socket.
Connect the other end of each cord to a different PDU.
6
On the expansion shelf, connect a power cord to each power supply socket.
Connect the other end of each cord to a different PDU.
See
"Turning on the hardware and verifying operation"
You must turn on the hardware components in a specific sequence to ensure correct
communication between them.
The correct sequence is as follows:
Hardware installation procedures
Turning on the hardware and verifying operation
on page 72.