VERITAS NetBackup 5330 Installation Manual page 18

Appliance hardware
Table of Contents

Advertisement

Understanding the NetBackup 5330 hardware installation sequence
Storage shelf and compute node hardware installation sequence
Table 1-3
(continued)
Step
Description
9
If you want to connect one or more expansion shelves to existing expansion
shelves: Connect two new SAS2 cables between the two expansion shelves.
Then, disconnect one end of two SAS2 cables from the existing expansion shelf
and connect them to a new expansion shelf.
See
"Connecting new expansion shelves to existing expansion shelves and an
existing primary shelf"
10
Connect the Power Distribution Unit (PDU) cords between the compute node and
the power distribution outlets in the rack.
See
"Connecting the power cords to the hardware"
11
Connect the Power Distribution Unit (PDU) cords between each storage shelf and
the power distribution outlets in the rack. The storage shelves require 220 VAC.
See
"Connecting the power cords to the hardware"
12
Turn on power to the storage shelves and the compute node. Be sure to use the
correct sequence.
See
"Turning on the hardware and verifying operation"
13
Configure the IPMI port and the NIC1 (eth0) interface.
See
"Configuring the IPMI port from the NetBackup Appliance Shell Menu"
on page 81.
Storage shelf and compute node hardware installation sequence
Table 1-4
for a NetBackup 5330 high availability configuration
Step
Description
1
Unpack the storage shelves.
See
"Unpacking a primary shelf or an expansion shelf"
2
Unpack the compute nodes.
See
"Unpacking a compute node"
3
Determine the rack locations for the storage shelves and the compute nodes.
See
"Determining rack locations "
on page 58.
on page 29.
on page 30.
Hardware overview
on page 71.
on page 71.
on page 72.
on page 26.
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents