Verifying the hardware installation of a high
availability configuration
Hardware installation procedures for a NetBackup 5330 high availability configuration

Verifying the hardware installation of a high availability configuration

To connect the two nodes
1
Locate the NIC3/eth2 and NIC4/eth3 ports on each node.
2
Connect the NIC3/eth2 and NIC4/eth3 ports on both nodes with two Ethernet
cables.
3
Verify that the connections match the ports in the following diagram.
Existing compute node
Partner node
Verify that the connections match the ports in the following diagram for the hardware
installation of a high availability (HA) configuration:
NIC3/eth2 NIC4/eth3