3
Verify that the left-most LEDs on both power canisters are green.
4
Verify that the Power LED on the front, left, of the shelf is green.
5
After approximately 5 minutes to 10 minutes, verify that the shelf has fully
initialized as follows:
The 12 disk LEDs on the front of each drawer are green.
■
Turning on the hardware and verifying operation
Power
Standby power
Locate
Temperature
Service action
required
Hardware installation procedures
74