VERITAS NetBackup 5330 Installation Manual page 74

Appliance hardware
Table of Contents

Advertisement

3
Verify that the left-most LEDs on both power canisters are green.
4
Verify that the Power LED on the front, left, of the shelf is green.
5
After approximately 5 minutes to 10 minutes, verify that the shelf has fully
initialized as follows:
The 12 disk LEDs on the front of each drawer are green.
Turning on the hardware and verifying operation
Power
Standby power
Locate
Temperature
Service action
required
Hardware installation procedures
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents