Connecting new expansion shelves to existing expansion shelves and an existing primary shelf
To turn off an operating system
1
First, turn off the compute node from the NetBackup Appliance Shell Menu.
2
Enter
3
Next, turn off the primary shelf.
4
Turn off both AC power switches on the rear panel of the primary shelf.
5
Turn off both AC power switches on the rear panel of the existing expansion
shelves.
and then
Support
shutdown
Hardware installation procedures
.
59