VERITAS NetBackup 5330 Installation Manual page 89

Appliance hardware
Table of Contents

Advertisement

Hardware installation procedures for a NetBackup 5330 high availability configuration
The following figure shows the locations of the FC ports Ch3 and Ch4 in the canisters
A and B of the Primary Storage Shelf.
XX
A
B
XX
To connect the partner node to the Primary Storage Shelf
1
Connect the slot 1 FC ports on the partner node to the following Primary Storage
Shelf canister FC ports:
Connect partner node slot 1, port 2 to Primary Storage Shelf canister B,
FC Ch3.
Connect partner node slot 1, port 1 to Primary Storage Shelf canister A,
FC Ch3.
2
Connect the slot 4 FC ports on the partner node to the following Primary Storage
Shelf canister FC ports:
Connect partner node slot4, port 2 to Primary Storage Shelf canister B, FC
Ch4.
Connecting the partner node to the Primary Storage Shelf
Slot 3
Slot 6
Slot 2
Slot 5
Slot 1
2 1
Slot 4
Ch3 Ch4
XX
XX
Ch3 Ch4
2 1
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents