FIGURE NO.
74-12.
74-13.
74-14.
74-15.
74-16.
74-17.
74-18.
74-19.
74-20.
74-21.
74-22.
74-23.
74-24.
74-25.
74-26.
74-27.
74-28.
74-29.
74-30.
74-31.
74-32.
74-33.
74-34.
74-35.
74-36.
74-37.
74-38.
74-39.
74-40.
74-41.
74-42.
74-43.
74-44.
74-45.
78-1.
80-1.
80-2.
80-3.
80-4.
80-5
80-6.
81-1.
PIPER AIRCRAFT
PA-28RT-201 / 201T
MAINTENANCE MANUAL
LIST OF ILLUSTRATIONS (cont)
SUBJECT
Assembly Tool
Assembly Tool Application
Measuring Lead Assembly Length
Ferrule Seating Tool
Measuring Wire From Top of Ferrule
Needle
Installing Grommet Over Lead Assemblies
Lead Assembly Installed in Grommet
Wire Doubled Over For Installation of Eyelet
Ignition Schematic
Removing Frozen Spark Plug
Contact Points
Rotor Holding Tool Installed
Timing Kit Installed
Aligning Timing Marks
Checking Flyweight Clearance of Impulse Coupling
Engine Timing Marks
Magneto Adjustment Limits
Magneto Timing Marks
Removing Spring From Lead Assembly
Assembly Tool
Using Assembly Tool
Measuring Lead Assembly Length
Cutting Metallic Braid From End of Lead
Unbraiding Metallic Shielding
Forming Shielding Around Ferrule
Ferrule Seating Tool
Needle
Measuring Wire From Top of Ferrule
Installing Grommet Over Lead Assemblies
Lead Assembly Installed in Grommet
Wire Doubled Over For Installation of Eyelet
Removing Spark Plug Frozen to Bushing
Ignition Switch Wire Positions
Exhaust System Inspection Points
Exploded View of Gear Reduction Starting Motor
Turning Starting Motor Commutator
Testing Motor Armature for Shorts
Testing Motor Fields for Grounds
No-Load Test Hook-Up
Stall-Torque Hook-Up
Schematic Diagram of Turbocharger System
2A14
GRID NO.
3D21
3D22
3D23
3D24
3D24
3D24
3D24
3E2
3E2
3E3
3E5
3E9
3E10
3E10
3E10
3E10
3E13
3E13
3E14
3E15
3E16
3E16
3E17
3E17
3E17
3E19
3E19
3E19
3E21
3E21
3E21
3E21
3E22
3F1
3G4
3G15
3G17
3G17
3G17
3G19
3G19
3H4
Introduction
Page - 13
Revised: July 13, 1983
Need help?
Do you have a question about the Arrow IV Turbo and is the answer not in the manual?
Questions and answers