Mounting and Commissioning
3.3 Commissioning
3.3.10

Polarity Check for Voltage Input V

only 7SJ623, 7SJ624 and 7SJ64
Depending on the application of the voltage measuring input V
If no measuring voltage is connected to this input, this subsection is irrelevant.
If input V
is used for the measurement of the displacement voltage U
4
VT Connect. 3ph = Vab, Vbc, VGnd or Van,Vbn,Vcn,VGn), the polarity is checked together with the
current measurement I
only for synchronizing feature in 7SJ623, 7SJ624 and 7SJ64
is used for measuring a voltage for synchronism check (Power System Data 1, Address 213
If the input V
4
VT Connect. 3ph = Van,Vbn,Vcn,VSy), the following is to be observed:
• The single-phase voltage V
• The polarity must be checked as follows using the synchronism check function:
The device must be equipped with the synchronism and voltage check which is to be configured in address
16x SYNC Funktion x = SYNCHROCHECK.
needed for synchronization is to be set correctly in address 6x23 CONNECTIONof V2.
Voltage V
2
If a transformer is located between the measuring points of reference voltage V
nized V
, its phase rotation must be taken into consideration. For this purpose an angle corresponding to the
2
transformer vector group is entered in address 6X22 ANGLE ADJUSTM.. The angle is set in direction busbar
viewed from the feeder. An example is shown in Subsection 2.19.1.
If necessary different transformation ratios of the transformers on the busbar and the feeder may have to be
considered under address Balancing V1/V2.
The synchronism and voltage check must be switched under address 6x01 Synchronizingx = ON.
A further aid for checking in the connection are the messages 170.2090 „25 V2>V1", 170.2091 „25 V2<V1",
170.2094 „25 α2>α1" and 170.2095 „25 α2<α1" in the spontaneous messages.
• Circuit breaker is open. The feeder is isolated (zero voltage). The VTmcb's of both voltage transformer cir-
cuits must be closed.
• For the synchrocheck the program Direct CO is set to YES (address 6X10); the other programs (addresses
6X07 to 6X09) are set to NO.
• Via binary input (170.0043 „>25 Sync req.") initiate the measuring request. The synchronization check
must release closing (message „25 CloseRelease", 170.0049). If not, check all relevant parameters
again (synchrocheck configured and enabled correctly, see Sections 2.1.1 and 2.19.1).
• Set address 6x10 Direct CO to NO.
• Then the circuit breaker is closed while the line isolator is open (see Figure 3-36). Both voltage transformers
therefore measure the same voltage.
• For the synchrocheck the program SYNC Function Group X is set to ASYN/SYNCHRON (address 016x)
(only applies to 7SJ64).
• Via binary input (170.0043 „>25 Sync req.") initiate the measuring request. The synchronism check
must release closing (message „25 CloseRelease", 170.0049).
454
4
(see further down).
4
needed for synchronization is to be connected to input V
2

(only 7SJ623, 7SJ624 and 7SJ64)

of a 7SJ64, a polarity check may be necessary.
4
(Power System Data 1 Address 213
en
C53000-G1140-C207-2, Release date 01.2008
.
4
and the voltage to be synchro-
1
SIPROTEC, 7SJ62/64, Manual

Advertisement

Table of Contents
loading

Table of Contents