10. Reinstall the accessory pump into the propel
pump. Make sure the O--ring is installed on
the face of the pump. Reinstall the hardware
and tighten to 31 -- 40 Nm (27 -- 35 ft. lb).
11. Reconnect the two hydraulic hose to the
accessory pump. See hose diagram in this
section.
NOTE: Observe hydraulic cleanliness
requirements when opening hydraulic lines.
12. Reinstall the left hand side panel and left
hand grill.
13. Tilt the hopper forward, close the hopper
cover, and close the top engine cover.
14. Start the machine and operate the hydraulic
circuit. Check for proper operation.
ATLV 4300 330495 (10- -98)
HYDRAULICS
5-11