17. Go to the other end of the new propel cable
(1 inch of thread) and install the small cable
nut.
18. Turn the small nut down until there is .25
inch of threads left on the cable. Place a
small amount of blue loctite (242) onto the
threads of the cable.
19. Install the ball joint and spin down against
the small cable nut. Lock the nut against the
ball joint.
20. Position the new cable assembly into the
machine. Route the cable in the machine in
the same orientation as the old one.
NOTE: It is very important that the new cable
follows the same routing as the old one.
21. Position the hydroback into the mount
bracket. on the back side of the propel
pump. Tighten the jam nut. Make sure the
internal lock washer is on the hydroback
side of the mount bracket.
22. Install the hex screw and two spacers in the
clevis end of the cable and into the propel
pump arm. Tighten to 8 -- 10 Nm
(6 -- 8 ft. lb). Reinstall a plastic tie.
23. Go under the front of the machine and
position the propel cable into the mount slot
on the machine frame. Leave the jam nuts
loose for now.
24. Place the ball joint into the hole in the
bottom of the propel pedal. Tighten the nyloc
nut to 8 -- 10 Nm (6 -- 8 ft. lb).