Powering On
This chapter describes procedures for power cabling, interfacing with the CMCs,
and powering on the Sun Datacenter Switch 3456. Topics include:
"Preparing Power Supplies" on page 85
■
"Power Supply Administrative Commands" on page 86
■
"Working With CMCs" on page 87
■
"Powering On the Sun Datacenter Switch 3456" on page 91
■
Installing Power Supplies
The Sun Datacenter Switch 3456 ships with 6 power supplies installed. Depending
upon your configuration more power supplies might be needed. It is good practice
to install as many power supplies as reasonably possible, as it promotes future
expansion and extended service life.
▼ To Install Power Supplies
1. Unwrap the power supply from its antistatic packaging.
2. Swing open the release lever.
3. Orient the power supply with the handle on the left and the receptacle on the
right.
4. Slide the power supply into the open slot, pushing it in until the release lever
moves.
See
.
FIGURE 10-1
83