Number of People

The minimum number of people involved with the installation of the Sun Datacenter
Switch 3456 is two. Many tasks involve two people to maintain safety. While some
tasks only require one person, three people is ideal as it provides redundancy in
some situations and makes many tasks easier. Four people can make a couple of
tasks very easy. Yet in most situations, four or more people are detrimental, as they
might end up interfering with each other's work.

Tasks and Roles

TABLE 3-1
3456, the ideal number of people, and their roles for that task.
Tasks and Roles
TABLE 3-1
Task
Unloading crate from truck
Moving crate to unpacking area
Unpacking Sun Datacenter Switch
3456
Moving Sun Datacenter Switch
3456 to final location
Inspecting chassis
Inspecting pins
Cabling chassis management
controller (CMC)
Cabling power supplies
Installing fabric cards
describes the tasks involved with installing the Sun Datacenter Switch
No. of
People Roles for Task
1
Only one person can operate a forklift or pallet jack.
2
The operator of the forklift or pallet jack, and another person to
offer guidance and feedback when moving the crate.
4
Two people can do this task, however, more people can speed up
the tasks. Additionally, tasks can happen at the four corners of the
chassis in parallel.
3
At least two people, one to push, the other to steer. With three
people, one pushes, the other two push and steer. With four, all
push and steer. Additionally, a non-pushing person can handle
situations that might need correction, such as a propped door
coming loose or caterpillaring the panels over carpet.
4
One person can accomplish this task, but a person at each corner
can speed things up greatly.
2
One person can accomplish this task, but a person on each side can
speed things up greatly.
1
A simple cable connection requires only one person.
2
One person can accomplish this task. Two people, working from the
outer sides to the center, can speed up the task.
2
The synchronized procedures of installing the fabric cards requires
two people for lifting the cards into place. Insertion is better
handled by two people, though one person can accomplish the task.
Chapter 3
Preparing for Installation
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Datacenter Switch 3456 and is the answer not in the manual?

Table of Contents