FIGURE 5-9
3. The pusher begins the rollout as the guiders steer the chassis.
Halfway off the pallet, the chassis might bottom out on the pallet edge because of
the antitilt bar. In this situation:
a. The pusher continues to push, flexing the pallet load surface with the
b. The guiders move the chassis side-to-side in a concerted fashion.
4. The pusher stops pushing and moves to the end of the ramps to assist the
guiders.
5. The guiders control the descent of the chassis down the ramps and onto the
floor.
Note – Though not recommended, rollout is possible with just two people. At
b, the guider must repeatedly switch sides until the chassis moves free. Additionally,
the pusher will take the side opposite the guider in
6. (Optional) Reassemble the crate.
a. Remove the ramps from the side of the pallet.
32
Sun Datacenter Switch 3456 Installation Guide • December 2008
Rolling Out the Chassis
pusher's weight.
Once the antitilt bar has cleared the pallet edge, the chassis will begin rolling
down the ramps under its own weight.