Sun Microsystems Datacenter Switch 3456 Installation Manual page 123

Table of Contents

Advertisement

moving the chassis, 35
N
network
cabling checklist, 12
network checklist, 12
P
partial configuration, 7
path surface, 17
path to final location, 15
carpets, 15
doors, 16
elevators, 16
grades, 16
path surface, 17
path turns, 17
security systems, 15
signage, 15
thresholds and gaps, 17
path turns, 17
personnel
checklist, 13
mindset
diligent, 21
methodical, 20
safety, 20
number of people, 19
tasks and roles, 19
pins
inserting, 57
removing, 54, 56
power cabling checklist, 12
power checklist, 11
power supply
filler panels
removing, 39
installing, 83
mapping, 87
powering
off, 87
on, 86, 91
verifying status, 87
powering
fabric card
off, 68
on, 68
108
Sun Datacenter Switch 3456 Installation Guide • December 2008
line card
off, 79
on, 78
power supplies
off, 87
on, 86, 91
psustatus command, 87
R
receiving area, 18
cleanliness, 18
equipment, 18
removing
cable guides
plates, 94
trays, 98
trees, 96
cables, 102
line card filler panels, 40
midplane stiffener, 66
pins, 54, 56
plastic envelope, 29
power supply filler panels, 39
shipping crate components, 26
rolling out the chassis, 32
S
securing the chassis, 39
security systems, 15
shipping crate components
removing, 26
shmstatus CLIA command, 90
showpresent command, 91, 92
showunhealthy CLIA command, 92
signage, 15
spacing checklist, 12
standard tools, 21
suggested configuration, 10
T
thresholds, 17
tools, 21
tools checklist, 13
administration, 14
installation, 14
maintenance, 14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Datacenter Switch 3456 and is the answer not in the manual?

Table of Contents