____ Is there sufficient spacing at the final location for installation activities?
■
____ Is there sufficient spacing at the final location for operation and air flow
■
management?
Loading Checklist
____ Can the final location accommodate the weight of the fully configured
■
chassis?
____ Can the path to the final location accommodate the weight of the chassis?
■
____ Have reinforcements to the flooring been installed?
■
____ Can the elevator accommodate the weight of the chassis?
■
Environmental Checklist
____ Can the environmental control system support the thermal demands of the
■
switch?
____ Have additional cooling systems been installed and tested operational?
■
____ Have the air flow characteristics of the final location been analyzed?
■
____ Has the air flow management been configured for the Sun Datacenter Switch
■
3456's additional heat load?
Personnel Checklist
____ Have the appropriate personnel for installation, administration, and
■
maintenance been determined?
____ Do the personnel understand their responsibilities?
■
____ Have the personnel read and understood the Sun Datacenter Switch 3456
■
documentation respective to their activities?
____ Are the personnel properly equipped for their tasks?
■
____ Are the personnel available to perform their tasks?
■
Tools Checklists
Are the tools readily available for installation, administration, and maintenance?
Chapter 3
Preparing for Installation
13