Loading Checklist; Environmental Checklist; Personnel Checklist; Tools Checklists - Sun Microsystems Datacenter Switch 3456 Installation Manual

Table of Contents

Advertisement

____ Is there sufficient spacing at the final location for installation activities?
____ Is there sufficient spacing at the final location for operation and air flow
management?

Loading Checklist

____ Can the final location accommodate the weight of the fully configured
chassis?
____ Can the path to the final location accommodate the weight of the chassis?
____ Have reinforcements to the flooring been installed?
____ Can the elevator accommodate the weight of the chassis?

Environmental Checklist

____ Can the environmental control system support the thermal demands of the
switch?
____ Have additional cooling systems been installed and tested operational?
____ Have the air flow characteristics of the final location been analyzed?
____ Has the air flow management been configured for the Sun Datacenter Switch
3456's additional heat load?

Personnel Checklist

____ Have the appropriate personnel for installation, administration, and
maintenance been determined?
____ Do the personnel understand their responsibilities?
____ Have the personnel read and understood the Sun Datacenter Switch 3456
documentation respective to their activities?
____ Are the personnel properly equipped for their tasks?
____ Are the personnel available to perform their tasks?

Tools Checklists

Are the tools readily available for installation, administration, and maintenance?
Chapter 3
Preparing for Installation