C H A P T E R

Installing the Chassis

This chapter describes procedures for installing and inspecting the Sun Datacenter
Switch 3456 chassis. Topics include:
"Installing the Chassis" on page 35
"Inspecting the Chassis" on page 43
Installing the Chassis
This section describes getting the chassis to the final location.

▼ To Move to the Final Location

This procedure assumes that you have the final location ready for receiving the Sun
Datacenter Switch 3456 chassis, and that the chassis has been unpacked from the
shipping crate.
1. Walk the path to the final location.
Prop open any doors that must be passed.
Take preparatory steps if security must be overridden.
Post signs for directions and information for others not involved with the
movement.
Sweep the path and check the floor surfaces for objects that might hinder
movement, and remove those objects.
Check for folds or loose ends of carpeting (if traveling over carpeting).
Have metal sheets or masonite panels ready for thresholds, gaps, or carpeting.
Remove any obstructions from the path.
35