Preparing for Installation

This chapter describes tasks to be accomplished before actually installing the Sun
Datacenter Switch 3456. Topics include:
"Final Location Checklists" on page 11
"Path to Final Location" on page 15
"Receiving Area" on page 18
"Personnel" on page 18
"Installation and Maintenance Tools" on page 21

Final Location Checklists

This section includes a checklist that the installers can use to ensure that they are
ready for installation. This checklist covers power, air conditioning, network cabling,
spacing, loading, and other topics.

Power Checklist

____ Are correct power cables used?
____ Is power routed through circuit breakers to code?
____ Is power conditioned before the chassis?
____ Is the power turned off?
____ Has a backup solution been implemented?
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Datacenter Switch 3456 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents