Network Checklist
____ Has the network topology been determined?
■
____ Has the blueprint been determined?
■
____ Has the IB support network been configured?
■
Cabling Checklists
Power Cabling Checklist
____ Have the cables been routed from facility power to backup, through conduits
■
to breakers to conditioner to switch?
____ Have the cables been labeled for their respective connections?
■
____ Have the cables been properly bundled?
■
____ Have the cables been given enough slack for installation?
■
____ Have appropriate connectors been fitted?
■
Network Cabling Checklist
____ Have the cables been routed between IB switches and the Sun Datacenter
■
Switch 3456?
____ Have the cables been labeled for their respective ports?
■
____ Have the cables been properly bundled?
■
____ Have the cables been given enough slack for installation?
■
Spacing Checklist
____ Has enough work area been cleared for receiving the chassis and
■
components?
____ Is this area clean?
■
____ Has enough space been allocated for the path to the final location?
■
____ Are doors set open?
■
____ Are doors, hallways, and elevators large enough to accommodate the Sun
■
Datacenter Switch 3456?
____ Are carpets covered with hard surfaces?
■
____ Are gaps and thresholds appropriately prepared?
■
12
Sun Datacenter Switch 3456 Installation Guide • December 2008