Installation Sequence - Sun Microsystems Datacenter Switch 3456 Installation Manual

Table of Contents

Advertisement

4
C H A P T E R

Installation Sequence

This chapter outlines the sequence of events that occur to receive the Sun Datacenter
Switch 3456, uncrate it, transport it to the final location, inspect the chassis, install
components, attach power, cable it, and begin administration.
"Installation Sequence" on page 23
Installation Sequence
TABLE 4-1
those procedures.
Sun Datacenter Switch 3456 Installation Sequence
TABLE 4-1
Step
Task
1
Remove the Sun Datacenter Switch 3456 from its crate.
2
Remove the fabric cards, line cards, and cabling hardware
from their boxes.
3
Transport the Sun Datacenter Switch 3456 to the final location.
4
Level the chassis.
5
Secure the chassis.
6
Remove the filler panels (if installed).
7
Inspect the chassis.
describes the installation task sequence and provides cross-references to
Cross-Reference
"Unpacking the Chassis" on page 25
"To Move to the Final Location" on page
35
"To Level the Chassis" on page 36
"To Secure the Chassis" on page 39
"To Remove the Power Supply Filler
Panels" on page 39
"To Remove the Line Card Filler Panels"
on page 40
"Inspecting the Chassis" on page 43
23