Power Supply; Installation - NEC EXPRESS5800/120MF User Manual

Hide thumbs Also See for EXPRESS5800/120MF:
Table of Contents

Advertisement

7-22 Upgrading your Server

Power Supply

The addition of a third hot-swap power supply makes your system so that it has redundant power
and can be operated continuously without interruption if either of the power supplies malfunction.

Installation

To install the optional hot-swap power supply, perform the following procedures:
See the section Preparing for Upgrade described earlier in this chapter.
1.
At the rear of the cabinet locate the power supply bay, (with a blank cover over it), where
2.
the optional power supply will be installed.
Remove the blank cover by grasping its handle (1) with your right hand, press the latch
3.
with your index finger, pull the handle down slightly (2), and slide the cover out of the bay
(3). Save the blank cover for future use.
Slide the new power supply into the bay until its latch clicks into place.
4.
Using pliers, remove the dust cover from the second AC inlet.
5.
Connect two power cords to the AC inlets.
6.
Use the standard power cord coming with the server and the cord coming with the power
supply.
Turn on the system.
7.
The AC power LEDs on the power supplies are lit. When the server is in redundant power
supply configuration, the ACR LED on the rear of the server lights up.
2
1
3
2
1
Dust cover

Advertisement

Table of Contents
loading

Table of Contents