Powering On the Server the First Time
Use the following information based on your server's type of input power.
Step
Description
1.
Review power requirements.
2.
Apply either AC or DC power to the
server.
3.
Power on the host for the first time.
Related Information
"Understanding the Server" on page 9
■
"Confirming Specifications" on page 17
■
"Preparing for Installation" on page 25
■
"Installing the Server" on page 29
■
"Connecting Cables" on page 61
■
Connect AC Power Cords
As soon as the power cables are connected to the power source, the server goes into
Caution -
Standby mode and the Oracle ILOM SP initializes.
Do not operate the server unless all fans, component heatsinks, air baffles, and the
Caution -
top cover are installed. Severe damage to server components can occur if the server is operated
without adequate cooling mechanisms.
Links
"Electrical Specifications" on page 18
"Input Power Information" on page 19
"Overcurrent Protection Requirements" on page 20
"DC Power Source, Power Connection, and Grounding
Requirements" on page 21
"Connect AC Power Cords" on page 73
"Assembling DC Power Cords and Applying DC
Power" on page 75
"Power On the Host for the First Time" on page 83
Powering On the Server the First Time
73
Need help?
Do you have a question about the Netra X5-2 and is the answer not in the manual?
Questions and answers