Connecting Cables
Perform the following tasks to connect and configure the network and serial ports before you
apply power to the server.
Step
1.
2.
3.
4.
Related Information
"Understanding the Server" on page 9
■
"Confirming Specifications" on page 17
■
"Preparing for Installation" on page 25
■
"Installing the Server" on page 29
■
"Powering On the Server the First Time" on page 73
■
Available Connections
Before applying power to the server, provide connectivity to the SP and server.
Description
Review the available connections.
Cable the SP.
Cable the Ethernet ports.
(Optional) Connect other data cables.
Links
"Available Connections" on page 61
"Cable the SP" on page 64
"SER MGT Port" on page 66
"NET MGT Port" on page 67
"USB Ports" on page 69
"Cable the Ethernet Ports" on page 65
"10 Gigabit Ethernet Ports" on page 68
"Connect Other Data Cables" on page 65
"USB Ports" on page 69
"Video Port" on page 70
Documentation for your PCIe cards
Connecting Cables
61