Powering On the Server the First
Time
Use the following information based on your server's type of input power.
Step
1.
Review power
requirements.
2.
Apply either AC or DC
power to the server.
3.
Power on the host for the
first time.
Related Information
"Understanding the Server" on page 1
"Confirming Server and Site Specifications" on page 9
"Preparing for Installation" on page 19
"Installing the Server in a 4-Post Rack" on page 27
"Installing the Server in a 2-Post Rack" on page 51
"Connecting Cables" on page 77
"AC and DC Power Supply Specifications" on page 11
"Input Power Information" on page 12
"Overcurrent Protection Requirements" on page 13
"DC Power Source, Power Connection, and Grounding
Requirements" on page 14
"Connect AC Power Cords" on page 92
"Assembling DC Power Cords and Applying DC
Power" on page 93
"Power On the Host for the First Time" on page 103