Available Connections
Use the information in this topic to plan for these connections. Then gather the required
network addresses and cables.
Caution -
Ethernet and power connections) must be made using shielded cables, and both ends of the
shield must be grounded.
Caution -
isolated from the exposed outside plant cabling. Using primary protectors does not eliminate
this restriction. Ensure that these connections do not connect metallically to interfaces that
connect to the outside plant or its wiring.
This figure and table describe available ports and lists what you need to use them.
No.
Port
Description
1
VGA
Provides a video connection to the SP.
62
Netra Server X5-2 Installation Guide • June 2016
To comply with NEBS lightning requirements, all I/O connections (except the
All data cable connections are restricted to intra-building interfaces and must be
Needed
VGA monitor and cable (not to exceed 6 meters).