Connect DC Power Cords
Caution -
present on the DC power cables.
3.
Route the power cords from the power source to the rear of the server and
secure the cables.
4.
Connect the chassis ground wire to the facility ground and ensure that the
connections are properly tightened.
See
"Connect the Chassis Ground Wire" on page
5.
Connect the -48V or -60V Return and Source wires to the circuit breaker or fuse
panel if they are not already connected.
Caution -
6.
Connect the power wiring to the server by plugging each power cable into the
power supply units.
7.
When you are ready to apply power, energize the input cables and verify that the
green DC input LED is illuminated on each power supply.
Power is immediately supplied to the SP, and the front panel SP OK/Fault LED flashes (see
"Front Panel Components (Installation)" on page
initializes the Oracle ILOM firmware.
82
Netra Server X5-2 Installation Guide • June 2016
Do not proceed with these instructions until you are sure that there is no voltage
Do not turn on the circuit breakers at this time.
76.
12). The SP then runs diagnostics and
Need help?
Do you have a question about the Netra X5-2 and is the answer not in the manual?